* [Category] G : Government R&D / P : Private Company / L : Local Government / P.E : Pubilc Enterprise
2020
No |
Category |
Government Department |
Funding Organization |
Project Leader |
Project Name |
Date |
1 |
G |
Ministry of SMEs and Startup |
Korea Technology and Information Promotion Agency for SMEs |
Sang-hoon Oh |
Development of vertical strut seismic system with high performance steel damper |
2020-01-01 ~ 2020-10-31 |
2 |
P |
Private company |
DOORI Co.,Ltd |
Eun-rim Baek |
Development of seismic performance improvement technology of SMC water storage tank |
2020-03-01 ~ 2021-02-28 |
3 |
G |
Ministry of Education |
National Research Foundation of Korea |
Su-won Son |
Dynamic Modeling and Seismic Performance Evaluation of Geotechnical Seismic Foundation Isolation System according to Ground Condition and Foundation |
2020-03-01 ~ 2021-02-28 |
4 |
P.E |
Ministry of Trade and Industry |
Korea Electric Power Corporation (KEPCO) |
Bub-gyu Jeon |
Full-scale test of substation facilities for seismic performance evaluation |
2020-05-18 ~ 2020-09-17 |
5 |
G |
Ministry of the Interior and Safety |
Ministry of the Interior and Safety |
Sang-hoon Oh |
Development of Post-earthquake Damage Evaluation and Rapid Rehabilitation Techniques for Buildings |
2020-04-29 ~ 2020-12-31 |
6 |
G |
Ministry of the Interior and Safety |
Korea Evaluation Institute Of Industrial Technology |
Hyeong-suk Choi |
Damage assessment and management for infrastructure systems using learningbased seismic force estimation method |
2020-04-01 ~ 2020-12-31 |
7 |
P.E |
Ministry of Science, ICT and Future Planning |
Gyeongnam Techno Park |
Hyeong-suk Choi |
Structural Safety Evaluation Technology of Existing Public Buildings Using Digital Twin |
2020-06-01 ~ 2020-11-30 |
8 |
P |
Private company |
JK RST Co., Ltd |
Su-won Son |
Performance Evaluation of Seismic Isolation System Using Seismic Simulation Shaking Table System |
2020-06-01 ~ 2020-07-31 |
9 |
G |
Ministry of Education |
National Research Foundation of Korea |
Young-soo Jeong |
Development of optimized technique of maintenance coating for extend service life of steel bridge |
2020-06-01 ~ 2023-05-31 |
10 |
P |
Private company |
Sandol Corporation Co., Ltd |
Sang-hoon Oh |
Experimental Services for Seismic Performance Evaluation of Ungrounded Materials |
2020-06-23 ~ 2020-11-30 |
11 |
G |
Ministry of Education |
National Research Foundation of Korea |
In-tae Kim |
Development of visual inspection technique for fire damage evaluation of infrastructures |
2020-07-01 ~ 2020-09-11 |
12 |
P |
Private company |
Doosan E&C |
Bub-gyu Jeon |
Production and test of Tuned Mass Damper for APR1400 |
2020-07-01 ~ 2020-10-31 |
13 |
P.E |
National Land Safety Management Agency |
National Land Safety Management Agency |
Sang-ho Lee |
Service for the preparation of comprehensive performance improvement project procedures and evaluation systems of existing buildings |
2020-07-13 ~ 2020-10-31 |
14 |
P.E |
Korea Atomic Energy Research Institute |
Korea Atomic Energy Research Institute |
Jae-bong Kim |
Seismic performance evaluation test for concrete anchorage of nuclear equipment |
2020-09-01 ~ 2023-02-28 |
15 |
P.E |
Korea Gas Corporation |
Korea Gas Corporation |
Sung-jin Chang |
Failure behavior analysis and fragility calculation of full-scale pipe for high strain cyclic loads |
2020-11-10 ~ 2020-12-18 |
16 |
P.E |
Korea Atomic Energy Research Institute |
Korea Atomic Energy Research Institute |
Jae-bong Kim |
Research of vibration characteristics of shear wall structures |
2020-12-29 ~ 2021-08-25 |
2019
No |
Category |
Government Department |
Funding Organization |
Project Leader |
Project Name |
Date |
1 |
G |
Ministry of Education |
National Research Foundation of Korea |
Su-won Son |
Dynamic Modeling and Seismic Performance Evaluation of Geotechnical Seismic Foundation Isolation System according to Ground Condition and Foundation |
2019-06-01 ~ 2022-05-31 |
2 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Seong-haeng Lee |
Development of temperature change processor and equation for the estimation of the moving capacity of bridge expansion joints and moving bearings |
2019-06-01 ~ 2022-02-28 |
3 |
G |
Ministry of Education |
National Research Foundation of Korea |
Jung-han Kim |
Generation of Input Ground Motions for Performance Based Seismic Design |
2019-06-01 ~ 2024-05-31 |
4 |
L |
National University |
Pusan National University |
Sang-ho Lee |
Review on the safety rating adequacy of buildings in Pusan National University |
2019-07-23 ~ 2019-09-20 |
5 |
P |
Private company |
EBM LEADER Co.,Ltd |
Sang-ho Lee |
Seismic performance verification and development of seismic design method for heat crossing fasteners |
2019-10-01 ~ 2020-09-30 |
6 |
G |
Private company |
Korea Gas Corporation |
Sung-jin Chang |
Testing and examination of fracture behavior of actual piping under tensile and compressive loads |
2019-03-04 ~ 2019-07-03 |
7 |
G |
Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Eun-rim Baek |
Development of TCP(Textile-reinforced mortar & Capillary tube Panel) retrofitting technology to simultaneously improve Seismic and Energy Performance of the existing masonry buildings (SEP+) |
2019-04-05 ~ 2021-12-31 |
8 |
P |
Private company |
DAEWOO E&C |
Chi-young Jung |
Evaluation on suitability of civil structure and improvement of construction safety for F-X hangar (2nd) |
2019-05-02 ~ 2019-12-31 |
9 |
P |
Private company |
Korea Gas Corporation |
Sung-jin Chang |
Examination of fracture behavior of actual pipes under cycling loads |
2019-09-05 ~ 2019-11-30 |
10 |
P |
Private company |
DAEHEUNG MECHATRONICS Co.,Ltd |
Sung-jin Chang |
Development of design technology for diesel generator bed system |
2019-11-12 ~ 2020-07-09 |
2018
No |
Category |
Government Department |
Funding Organization |
Project Leader |
Project Name |
Date |
1 |
P |
Private company |
Woori E&C Co.,Ltd |
Sang-ho Lee |
Research project on the seismic performance evaluation of Bugok elementry school |
2018-01-01 ~ 2018-02-28 |
2 |
P |
Private company |
POSCO Co,Ltd. |
Sang-hoon Oh |
Gwangyang Works multi-use facility and main structure 1st stage seismic performance evaluation service |
2018-01-02 ~ 2018-08-31 |
3 |
P |
Private company |
POSCO E&C |
Sang-hoon Oh |
Performance evaluation of seismic isolation system in logistics warehouse |
2018-02-01 ~ 2018-08-31 |
4 |
P |
Private company |
Korea Iron & Steel Association |
Sang-hoon Oh
|
Steel house seismic performance evaluation experiment service |
2018-02-01 ~ 2018-05-31 |
5 |
P |
Private company |
SY BUILD Co.,Ltd |
Sang-hoon Oh |
Seismic performance evaluation experiment service of SY Polycam House |
2018-02-01 ~ 2018-07-31 |
6 |
P |
Private company |
HANADAPCO Co.,Ltd. |
Sang-ho Lee |
Study of seismic performance of fire-resist door (single / double type) |
2018-02-20 ~ 2019-02-19 |
7 |
P |
Private company |
POSCO Co,Ltd. |
Sang-hoon Oh |
Seismic reinforcement dynamic performance evaluation of masonry applied to steel |
2018-03-01 ~ 2018-05-31 |
8 |
G |
Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Sang-hoon Oh |
Development of seismic performance improvement of non-structural components in buildings |
2018-04-13 ~ 2021-12-31 |
9 |
G |
Ministry of Public Safety and Security |
National Disaster Management Research Institute (NDMI) |
Sang-hoon Oh |
National earthquake disaster prevention R & D roadmap planning research |
2018-05-29 ~ 2018-08-27 |
10 |
G |
Ministry of Education |
National Research Foundation of Korea |
Jae-bong Kim |
A study on development and practical application of seismic performance improvement system of anchorage for non-structural members |
2018-06-01 ~ 2021-05-31 |
11 |
G |
Ministry of Education |
National Research Foundation of Korea |
Sang-ho Lee |
Evaluation of seismic performance of buildings with pilotis considering dynamic behavior depending on lateral irregularity |
2018-06-01 ~ 2021-05-31 |
12 |
P.E. |
Ministry of Environment |
K-Water |
Jung-han Kim |
Development of a seismic design method for water facilities and TEST BED evaluation |
2018-06-22 ~ 2019-12-21 |
13 |
G |
Ministry of Education |
National Research Foundation of Korea |
Jung-han Kim |
Development of 3 dimensional seismic isolation technology and structural analysis and testing methods |
2018-07-01 ~ 2019-06-30 |
14 |
G |
Ministry of the Interior and Safety |
National Disaster Management Research Institute (NDMI) |
Sang-hoon Oh |
A Study on the Seismic Strengthening Method of Building Structures with Circular Steel Bar Damper for External Structure Reinforcement |
2018-08-16 ~ 2019-08-15 |
15 |
G |
Ministry of Education |
National Research Foundation of Korea |
Su-won Son |
Design method proposal according to ground conditions of improved liquefaction countermeasure methods for liquefaction prevention of sandy ground |
2018-09-01 ~ 2019-08-31 |
16 |
P |
Private company |
UNOVICS ENC Co., Ltd. |
Hyeong-suk Choi |
Seismic performance evaluation of supports for firefighting equipment piping |
2018-11-26 ~ 2019-11-25 |
17 |
P.E. |
Ministry of Trade and Industry |
Korea Hydro & Nuclear Power Co.,Ltd |
Hyeong-suk Choi |
Reproduction of Seismic Verification Document for Hanbit Units 3 and 4 |
2018-12-10 ~ 2019-10-09 |
18 |
P |
Private company |
Entire Safe System |
Young-soo Jeong |
Development for operational state monitoring system and design technique of seismic isolation |
2018-07-01 ~ 2020-06-30 |
19 |
P |
Private company |
MIDAS IT |
Sung-jin Chang |
Verification of seismic risk assessment software for nuclear piping system |
2018-07-16 ~ 2018-09-30 |
20 |
P |
Private company |
DAEWOO E&C |
Chi-young Jung |
Evaluation on suitability of civil structure and improvement of construction safety for F-X hangar |
2018-10-01 ~ 2019-05-31 |
21 |
P |
Private company |
PPI SYSTEM |
Sung-jin Chang |
Seismic Performance Evaluation of APPIZ water pipe |
2018-12-11 ~ 2019-03-31 |
2017
No |
Category |
Government Department |
Funding Organization |
Project Leader |
Project Name |
Date |
1 |
P |
Private company |
POSCO Co,Ltd. |
Sang-hoon Oh |
Seismic inspection and performance evaluation of Pohang building |
2017-01-01 ~ 2017-06-30 |
2 |
P |
Private company |
POSCO Co,Ltd. |
Sang-hoon Oh |
Dynamic performance evaluation of apartment remodeling using steel structure system |
2017-01-01 ~ 2017-06-30 |
3 |
P |
Private company |
Iljin Electric Co.,Ltd |
Bub-gyu Jeon |
Seismic performance evaluation of a cable termination by FEM analysis |
2017-02-01 ~ 2017-05-31 |
4 |
P |
Private company |
Cistern Co.,Ltd |
Eun-rim Baek |
Development of seismic design method of CSP water tank with tank-rack |
2017-03-01 ~ 2018-02-28 |
5 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Chi-young Jung |
Development of Self-deformation Recoverable Construction Connector for Structural Continuity of Modular PC Members |
2017-03-01 ~ 2020-02-29 |
6 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Bub-gyu Jeon |
An experimental study for Evaluating ultimate behavior of weak components of isolated nuclear power plant. |
2017-03-01 ~ 2019-12-31 |
7 |
G |
Ministry of Trade and Industry |
Korea Evaluation Institute of Industrial Technology (KEIT) |
Bub-gyu Jeon |
A Study on standardization foundation for piping system to secure seismic safety |
2017-04-01 ~ 2019-12-31 |
8 |
L |
Seoul Metropolitan Office of Education |
Seoul Metropolitan Office of Education |
Sang-hoon Oh |
Seismic performance evaluation verification service for Anam and Ohhyeoncho Elementary School in Seoul |
2017-05-12 ~ 2017-08-12 |
9 |
G |
Ministry of Education |
National Research Foundation of Korea |
Bub-gyu Jeon |
Multi-point monitoring technology of piping and pressure vessel of nuclear power plant using PTZ (Pan-Tilt-Zoom) system |
2017-06-01 ~ 2020-05-31 |
10 |
G |
Ministry of Education |
National Research Foundation of Korea |
Eun-rim Baek |
Study on seismic design model and interaction between a building and an elevated water tank considering liquid motion by earthquake |
2017-06-01 ~ 2020-05-31 |
11 |
G |
Ministry of Education |
National Research Foundation of Korea |
Sung-wan Kim |
Image-based automation system for tension measurement of long-span bridge cable |
2017-06-01 ~ 2020-05-31 |
12 |
G |
Ministry of Education |
National Research Foundation of Korea |
Hae-yong Park |
A study on development and practical application of the damage controlled system attached to beam end |
2017-06-01 ~ 2019-05-31 |
13 |
G |
Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Jae-bong Kim |
Developing standard test procedures based on performance for technology and product verification in the construction field |
2017-06-01 ~ 2021-05-31 |
14 |
G |
Ministry of Trade and Industry |
Korea Industrial Complex Corporation |
Bub-gyu Jeon |
Development of Large Capacity Seismic Diesel Generator using Seismic Isolation Bed System |
2017-06-01 ~ 2018-05-31 |
15 |
P |
Private company |
Bukyung BDS Co., Ltd |
Sang-hoon Oh |
Static test for structural performance evaluation of steel hysteresis damper |
2017-06-15 ~ 2017-08-15 |
16 |
P |
Private company |
HANMAEK E&C |
Sang-ho Lee |
Review of siesmic performance of earthquake resistant exterior panel |
2017-07-01 ~ 2017-12-31 |
17 |
P |
Private company |
POSCO Co,Ltd. |
Sang-hoon Oh |
Dynamic performance evaluation of open damping damper system |
2017-07-01 ~ 2017-11-30 |
18 |
G |
Ministry of Trade and Industry |
Korea SMEs and Startups Agency |
Eun-rim Baek |
Seismic simulation and experiment of isolated water tank with exterior reinforcement |
2017-07-03 ~ 2019-07-02 |
19 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
In-tae Kim |
Development of thermochromic sensor for rapid evaluation of fire damage to inrastructures |
2017-09-01 ~ 2020-08-31 |
20 |
G |
the Small and Medium Business Administration |
Korea SMEs and Startups Agency |
Hae-yong Park |
Diesel engine generator seismic and smoke-reducing political performance test |
2017-09-05 ~ 2017-11-30 |
21 |
G |
Ministry of Science, ICT and Future Planning |
Electronics and Telecommunications Research Institute |
Sang-ho Lee |
Structural analysis of communication buildings for seismic design of communication facility |
2017-10-27 ~ 2017-11-30 |
22 |
G |
Korea Meteorological Administration |
Korea Meteorological Institute |
Jung-han Kim |
Analysis of correlation between earthquake damage and intensity for architectural structures |
2017-11-01 ~ 2018-10-31 |
23 |
P |
Private company |
POSCO Co,Ltd. |
Sang-hoon Oh |
(Work Step 2) Seismic performance evaluation of main structures in Pohang ironworks |
2017-11-06 ~ 2018-05-31 |
24 |
G |
Ministry of Trade and Industry |
Korea Institute of Energy Technology Evaluation and Planning (KETEP) |
Jung-han Kim |
Development of Risk Quantification Technology for Seismic Probabilistic Safety Assessment |
2017-12-01 ~ 2022-06-30
|
25 |
P |
Private company |
HANADAPCO Co.,Ltd. |
Sang-ho Lee |
Study of seismic performance of non-fire resist watertight door(single / double type) |
2017-12-20 ~ 2018-12-20
|
26 |
G |
Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Hyeong-suk Choi |
Development of Seismic Damage Prediction System for Bridge Structures |
2017-01-01 ~ 2019-12-31
|
27 |
G |
Ministry of Trade and Industry |
Korea Institute of Energy Technology Evaluation and Planning (KETEP) |
Dong-uk Park |
Development of seismic performance evaluation technology of nuclear structures and equipments for excessively design high frequency earthquake |
2017-05-01 ~ 2022-04-30 |
28 |
P |
Private company |
Korea Atomic Energy Research Institute |
Bub-gyu Jeon |
Seismic performance verification experiment of through bolt and non-contraction grout for NPP wall |
2017-10-24 ~ 2017-12-27 |
2016
No |
Category |
Government Department |
Funding Organization |
Project Leader |
Project Name |
Date |
1 |
P.E |
Ministry of Trade and Industry |
Korea Electric Power Corporation (KEPCO) |
Sang-hoon Oh |
Development and design of seismic reinforcement system for KEPCO office building |
2016-06-02 ~ 2017-12-31 |
2 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Sung-wan Kim |
Image-based automation system for tension measurement of long-span bridge cable |
2016-08-01 ~ 2017-10-31 |
3 |
G |
Ministry of Trade and Industry |
Korea Southern Power Co.,Ltd㈜ |
Dong-uk Park |
Development of technique for 3 dimensional isolation bearing for energy plant |
2016-11-01 ~ 2017-10-30 |
4 |
P |
Private company |
J&D Firefighting Co.,Ltd |
Jae-bong Kim |
Confirmation service for experimental results of Tokyo Polytechnic University in Japan, which evaluated the seismic performance of fire fighting piping |
2016-11-01 ~ 2016-11-30 |
5 |
P |
Private company |
RIST (Research Institute of Industrial Science & Technology) |
Sang-hoon Oh |
Seismic test and evaluation of panel system |
2016-12-01 ~ 2017-05-31 |
6 |
G |
Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Hyeong-suk Choi |
Development of seismic proofing methods and safety manuals for the storage racks in distribution center under earthquake |
2016-12-26 ~ 2018-06-25 |
7 |
P |
Private company |
Hyundai TECH |
Bub-gyu Jeon |
Seismic performance evaluation of bus duct system for electric buildings |
2016-04-25 ~ 2016-05-25 |
8 |
P |
Private company |
LS ELECTRIC |
Hyeong-suk Choi |
Mold transformer seismic performance analysis and test verification |
2016-07-08 ~ 2016-09-30 |
2015
No |
Category |
Government Department |
Funding Organization |
Project Leader |
Project Name |
Date |
1 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Nam-sik Kim |
Development of Load-carrying Capacity Assessment Method for Existing High-speed Railway Bridge by Using Multi-step Univariate Search Method |
2015-05-01 ~ 2018-04-30 |
2 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Choong-hyun Kang |
Development of technology to reduce environmental pollution and the maintenance cost of concrete structure using self-healing and micro- organisms |
2015-07-01 ~ 2016-11-30 |
3 |
P |
Private company |
Deokin Metals |
Sang-ho Lee |
Study on the shake table test for evaluation of seismic performance of interior and exterior cladding panel |
2015-07-10 ~ 2015-09-08 |
4 |
P |
Private company |
POSCO Co,Ltd. |
Sang-hoon Oh |
Development of the Dual System Joints Detail and Seismic Performance Evaluation |
2015-08-01 ~ 2016-02-29 |
5 |
G |
Ministry of Trade and Industry |
Korea Institute of Energy Technology Evaluation and Planning (KETEP) |
Yong-myeong Park |
Development of an integrated comdition assessment system for NPP concrete wall structures using drone-aided visual inspection, multi-physics non-destructive evaluation and advanced strctural analysis |
2015-09-01 ~ 2018-08-31 |
6 |
P |
Private company |
Korea Construction Engineering Development Collaboratory Management Institute (KOCED CMI) |
Sang-hoon Oh |
Hybrid tower vibration performance evaluation experiment |
2015-09-01 ~ 2015-10-31 |
7 |
P |
Private company |
Deokin Metals |
Sang-ho Lee |
English report for Study on the shake table test for evaluation of seismic performance of interior and exterior cladding panel |
2015-10-01 ~ 2015-10-31 |
8 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Seong-haeng Lee |
Development of Thermal Load Formula Considering Surfacing Thickness of Concrete Bridge Deck |
2015-11-01 ~ 2018-10-31 |
9 |
P |
Private company |
POSCO Co,Ltd. Humans |
Sang-ho Lee |
Structural analysis and test of solar structure made of the PosMac profile |
2015-11-20 ~ 2015-12-30 |
10 |
P |
Private company |
Hyundai Powertech |
Bub-gyu Jeon |
Seismic response analysis for bus duct system |
2015-06-11 ~ 2015-12-31 |
2014
No |
Category |
Government Department |
Funding Organization |
Project Leader |
Project Name |
Date |
1 |
P.E |
Ministry of Land, Transport and Maritime Affairs |
Korea Land & Housing Corporation |
Sang-hoon Oh |
Research service for seismic performance evaluation of LHI type vibration control system |
2014-01-25 ~ 2014-06-30 |
2 |
P |
Private company |
RIST (Research Institute of Industrial Science & Technology) |
Sang-hoon Oh |
Vibration performance evaluation between shear wall and frame |
2014-03-11 ~ 2014-12-31 |
3 |
P |
Private company |
Jace Korea Co.,Ltd |
Jin-hwan Cheung |
Study of performance analysis for partial isolation system |
2014-04-01 ~ 2014-04-30 |
4 |
P |
Private company |
CTC ENG |
Jin-man Kim |
Services on the socio-economic damage analysis and estimation of recovery cost for Gupo Bridge and Dongseo expressway during earthquake (3) |
2014-07-01 ~ 2016-02-29 |
5 |
P |
Private company |
JOEUN HITEC ENG |
Jin-man Kim |
Services on the socio-economic damage analysis and estimation of recovery cost for Gupo Bridge and Dongseo expressway during earthquake (2) |
2014-07-01 ~ 2016-02-29 |
6 |
P |
Private company |
Geukdong Engineering Co.,Ltd |
Jin-man Kim |
Services on the socio-economic damage analysis and estimation of recovery cost for Gupo Bridge and Dongseo expressway during earthquake (1) |
2014-07-01 ~ 2016-02-29 |
7 |
P |
Private company |
Samsung Heavy Industries |
Jin-hwan Cheung |
Insulation System Dynamic Performance Test |
2014-07-07 ~ 2014-08-07 |
8 |
G |
Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Nam-sik Kim |
Development of world-best fundamental technologies for nonlinear fluid-structure-soil interaction analysis by developing p-version dynamic infinite elements and performing sloshing shaking table tests |
2014-07-01 ~ 2026-07-10 |
9 |
G |
Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Nam-sik Kim |
Development of Small Scale Model Test Procedure Applying Nonlinear Similitude Law and Hybrid Simulation |
2014-07-01 ~ 2016-07-10 |
10 |
P |
Ministry of Land, Transport and Maritime Affairs |
Korea Land & Housing Corporation |
Sang-hoon Oh |
Shoes cabinet conduction experiment |
2014-10-01 ~ 2014-11-30 |
11 |
P |
Private company |
SAMADIO system Co.,Ltd |
Sang-ho Lee |
Study of seismic performance qualification for (light/heavy) watertight door for nuclear power plant |
2014-10-15 ~ 2015-12-31 |
12 |
P |
Private company |
HANADAPCO Co.,Ltd. |
Sang-ho Lee |
Study of seismic performance qualification test for (light/heavy) watertight door for operational nuclear power plant |
2014-10-15 ~ 2015-12-31 |
13 |
P |
Private company |
Samsung Heavy Industries |
Jin-hwan Cheung |
Insulation System Dynamic Performance Test(2) |
2014-11-01 ~ 2014-12-31 |
14 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Chi-young Jung |
Evaluation on ultimate strain of rebar with coupler |
2014-11-01 ~ 2017-04-30 |
15 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Jin-hwan Cheung |
Evaluation on ultimate strain of rebar embedded in concrete |
2014-11-01 ~ 2017-04-30 |
16 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Sang-ho Lee |
Evaluation of Seismic Performance for RC building having vertically discontinued member |
2014-11-01 ~ 2017-04-30 |
17 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
In-tae Kim |
Methods for evaluating load-carrying capacity of composite structural members of steel and concrete with corrosion damages |
2014-11-01 ~ 2017-10-31 |
18 |
P |
Private company |
UNOVICS ENC Co., Ltd. |
Jin-hwan Cheung |
ISOLATOR seismic building test research |
2014-12-31 ~ 2015-11-30 |
2013
No |
Category |
Government Department |
Funding Organization |
Project Leader |
Project Name |
Date |
1 |
P |
Private company |
Hyundai Development Company (HDC) |
Seong-haeng Lee |
The Structure Stability Evaluation by lift gate model vibration test and Fatihue Damage of Nakdong River Restroration 33th area |
2013-01-01 ~ 2013-07-31 |
2 |
P |
Private company |
Doosung Heavy Industries Co.,Ltd. |
Sang-hoon Oh |
DEB structural performance evaluation |
2013-01-21 ~ 2013-02-03 |
3 |
P |
Private company |
Samsung C&T |
Seong-haeng Lee |
The Structure Stability Evaluation by lift gate model vibration test and Fatihue Damage of Addition of New gate at Nakdong Esuary Dike |
2013-01-21 ~ 2013-06-30 |
4 |
P |
Private company |
SK E&C |
Seong-haeng Lee |
The Structure Stability Evaluation by lift gate model vibration test and Fatihue Damage of Nakdong River Restroration 20th area |
2013-02-01 ~ 2013-07-31 |
5 |
P |
Private company |
Hanyang Corporation |
Seong-haeng Lee |
The Structure Stability Evaluation by lift gate model vibration test and Fatihue Damage of Yeongsan River Restroration 6th area |
2013-02-20 ~ 2013-05-31 |
6 |
P |
Private company |
Samsung C&T |
Seong-haeng Lee |
The Structure Stability Evaluation by lift gate model vibration test and Fatihue Damage of Han River Restroration 4th area |
2013-02-25 ~ 2013-05-31 |
7 |
P |
Private company |
Daelim Industrial Co.,Ltd. |
Seong-haeng Lee |
The Structure Stability Evaluation by lift gate model vibration test and Fatihue Damage of Han River Restroration 3th area |
2013-03-01 ~ 2013-05-31 |
8 |
P |
Private company |
SEOKWANG INDUSTRIAL CO., LTD |
In-tae Kim |
Load analysis during assembly and installation of 5MW offshore wind monopile-transition |
2013-03-25 ~ 2013-08-31 |
9 |
P |
Private company |
Daelim Industrial |
In-tae Kim |
Field Construction case of maintenance and reinforcement for existing western nakdong river bridge |
2013-04-16 ~ 2013-08-31 |
10 |
P |
Private company |
Doosung Heavy Industries Co.,Ltd. |
Sang-hoon Oh |
DEB(Punching Web Beam) structural performance evaluation |
2013-05-01 ~ 2013-06-30 |
11 |
P |
Private company |
RIST (Research Institute of Industrial Science & Technology) |
Sang-hoon Oh |
Evaluation and testing of dynamic vibration performance of public buildings |
2013-05-01 ~ 2014-02-28 |
12 |
G |
Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Sang-hoon Oh |
Development of structural performance enhancement technologies for small-size or existing buildings against earthquakes and climate changes |
2013-05-15 ~ 2018-04-14 |
13 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Yong-myeong Park |
Experimental Study on the Dynamic Concrete Breakout Capacity of Cast-in-place Anchors under Seismic Shear Forces |
2013-06-01 ~ 2016-05-31 |
14 |
P |
Private company |
SAMADIO system Co.,Ltd |
Sang-ho Lee |
Research for seismic performance evaluation of a watertight door for the Nuclear Power Plant |
2013-06-17 ~ 2013-07-16 |
15 |
P |
Private company |
Doosan E&C |
Seong-haeng Lee |
The Structure Stability Evaluation by lift gate model vibration test and Fatihue Damage of Nakdong River Restroration 32th area |
2013-07-16 ~ 2014-02-28 |
16 |
P |
Private company |
SAMADIO system Co.,Ltd |
Sang-ho Lee |
Research for seismic performance evaluation of double type watertight door for Kori Nuclear Power Plant |
2013-09-01 ~ 2013-11-30 |
17 |
P |
Private company |
HANADAPCO Co.,Ltd. |
Sang-ho Lee |
Research for seismic performance evaluation of double type watertight door for Hanbit Nuclear Power Plant |
2013-09-10 ~ 2013-12-30 |
18 |
P |
Private company |
HANADAPCO Co.,Ltd. |
Sang-ho Lee |
Research for seismic performance evaluation of single type watertight door for Hanbit Nuclear Power Plant |
2013-09-10 ~ 2013-11-30 |
19 |
P |
Private company |
POSCO Co,Ltd. |
Sang-hoon Oh |
Seismic Performance Evaluation of Steel Structure Moment Resistance Frames with Non-buckling Braces |
2013-09-16 ~ 2013-12-31 |
20 |
P |
Private company |
Hyundai Development Company (HDC), HANJIN Heavy industries & Construction Co.,Ltd., KDC, KOLON GLOBAL, SSANGYONG E&C, DAEWOO E&C |
Yong-myeong Park |
Evaluation of strength for bolt connection joint by oxygen torch cut used for temporary structures in subway construction |
2013-10-01 ~ 2014-04-30 |
2012
No |
Category |
Government Department |
Funding Organization |
Project Leader |
Project Name |
Date |
1 |
P |
Private company |
ES DASAN |
Sang-ho Lee |
Structural analysis of the water proof door of flood protection facility in Gori nuclear power plant 1 & 2 |
2012-03-02 ~ 2012-05-31 |
2 |
G |
Ministry of the Interior and Safety |
National Disaster Management Research Institute (NDMI) |
Sang-hoon Oh |
Structural experiment to evaluate the damage of buildings damaged by earthquake and to verify the risk of collapse |
2012-04-06 ~ 2012-11-02 |
3 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Kyeong-min Kim |
Development of Damage Intensity and Seismic Capacity Evaluation Method Based on Quantitative Damage Estimation for Reinforced Concrete Structures |
2012-05-01 ~ 2015-04-30 |
4 |
P |
Private company |
HK industrial system Co.,ltd |
Sang-hoon Oh |
Development of a vibration isolation system for substation facilities and water and switchboards |
2012-05-21 ~ 2013-03-20 |
5 |
P |
Private company |
RIST (Research Institute of Industrial Science & Technology) |
Sang-hoon Oh |
Seismic reinforcement technique development and dynamic vibration performance test and evaluation of public buildings |
2012-06-01 ~ 2013-03-31 |
6 |
G |
Ministry of Trade and Industry |
Korea Institute for Advanced Technology (KIAT) |
Jin-hwan Cheung |
Development for a rall & frging tapered splice, ASTM A615, Gr.60 for construction of NPP |
2012-06-01 ~ 2015-04-30 |
7 |
P |
Private company |
K2H Co.,Ltd |
Sang-ho Lee |
Shaking table test for verifying seismic performance of steel-framed buildings with seismic block |
2012-07-16 ~ 2012-08-15 |
8 |
G |
Ministry of the Interior and Safety |
National Disaster Management Research Institute (NDMI) |
Sang-hoon Oh |
Development of Domestic Damage Prediction Technology for Volcanic Earthquakes |
2012-08-01 ~ 2015-02-28 |
2011
No |
Category |
Government Department |
Funding Organization |
Project Leader |
Project Name |
Date |
1 |
P |
Private company |
GS E&C |
Sang-hoon Oh |
Vibration control device optimal planning technology for vibration control |
2011-03-01 ~ 2011-04-30 |
2 |
G |
Ministry of Construction & Transportation |
Korea Agency for Infrastructure Technology Advancement |
Sang-hoon Oh |
Establish design / production guidelines for high- rise connections (step 2) |
2011-03-11 ~ 2014-07-31 |
3 |
P |
Private company |
RIST (Research Institute of Industrial Science & Technology) |
Sang-hoon Oh |
Deck grating new product structural performance test and evaluation |
2011-04-01 ~ 2011-10-31 |
4 |
P |
Private company |
RIST (Research Institute of Industrial Science & Technology) |
Sang-hoon Oh |
Dynamic test and performance evaluation of complex isolating system |
2011-04-01 ~ 2011-09-30 |
5 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Jin-hwan Cheung |
Pounding force assessment in seismic isolated bridge |
2011-05-01 ~ 2013-04-30 |
6 |
P |
Private company |
UJENG |
Sang-ho Lee |
Experimental research on the seismic performance of the stone exterior wall using EG RS method |
2011-07-11 ~ 2011-08-10 |
7 |
G |
Ministry of Construction & Transportation |
Korea Agency for Infrastructure Technology Advancement |
Jin-hwan Cheung |
Seismic performance evaluation of external reinforcement system for high level SMC water tank |
2011-08-31 ~ 2012-12-31 |
8 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Seong-haeng Lee |
Development of an Artificial Neural Expert System for Temperature Load in Bridge Design |
2011-09-01 ~ 2016-08-31 |
9 |
P |
Private company |
RIST (Research Institute of Industrial Science & Technology) |
Sang-hoon Oh |
Development of performance evaluation technology for special moment beam-column connection applied to plants |
2011-09-01 ~ 2011-12-31 |
10 |
P |
Private company |
Doosung Heavy Industries Co.,Ltd. |
Sang-hoon Oh |
Structural performance evaluation of corrugated beam |
2011-09-01 ~ 2012-02-28 |
2010
No |
Category |
Government Department |
Funding Organization |
Project Leader |
Project Name |
Date |
1 |
G |
Ministry of the Interior and Safety |
National Emergency Management Agency |
Sang-hoon Oh |
Static and dynamic experiments to verify the seismic reinforcement effect of masonry structures |
2010-03-23 ~ 2010-11-18 |
2 |
P |
Private company |
Dongho Corporation |
Seong-haeng Lee |
Hydraulic model vibration test of Geum River 7th area lift gate |
2010-03-24 ~ 2010-08-23 |
3 |
P |
Private company |
Dongho Corporation |
Seong-haeng Lee |
Hydraulic model vibration test of Nakdong River 20th area lift gate |
2010-03-24 ~ 2010-08-23 |
4 |
P |
Private company |
Hanyang Corporation |
Seong-haeng Lee |
Hydraulic model vibration test of Yeongsan River 6th area lift gate |
2010-04-12 ~ 2010-09-11 |
5 |
L |
Busan Metropolitan City Office of Education |
Busan Metropolitan City Office of Education |
Sang-ho Lee |
Research project for the seismic performance evaluation and retrofit of Geumjeong Girl's High School building |
2010-05-07 ~ 2010-07-05 |
6 |
L |
Busan Metropolitan City Office of Education |
Busan Metropolitan City Office of Education |
Sang-ho Lee |
Research project for the seismic performance evaluation of Yunil Middle School building |
2010-05-12 ~ 2010-06-30 |
7 |
L |
Busan Metropolitan City Office of Education |
Busan Metropolitan City Office of Education |
Sang-ho Lee |
Research project for the seismic performance evaluation and retrofit of Modong Middle School building |
2010-05-17 ~ 2010-07-15 |
8 |
L |
Busan Metropolitan City Office of Education |
Busan Metropolitan City Office of Education |
Sang-ho Lee |
Research project for the seismic performance evaluation and retrofit of Gaehwa Elementry School building |
2010-05-14 ~ 2010-07-12 |
9 |
L |
Busan Metropolitan City Office of Education |
Busan Metropolitan City Office of Education |
Sang-ho Lee |
Research project for the seismic performance evaluation and retrofit of Jaesong Girl's Middle School building |
2010-05-17 ~ 2010-07-05 |
10 |
L |
Busan Metropolitan City Office of Education |
Busan Metropolitan City Office of Education |
Sang-ho Lee |
Research project for the seismic performance evaluation and retrofit of Hadan Middle School building |
2010-05-17 ~ 2010-07-15 |
11 |
P |
Private company |
Samsung C&T |
Seong-haeng Lee |
Lift gate model vibration test of Addition of New gate at Nakdong Esuary Dike |
2010-05-17 ~ 2010-11-15 |
12 |
P |
Private company |
Entire Safe System |
Nam-sik Kim |
Seismic Performance Evaluation of Cone-type Friction Pendulum Bearing System Using Shaking Table Test |
2010-06-01 ~ 2011-01-31 |
13 |
G |
Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Jin-hwan Cheung |
Ultimate-level seismic performance evaluation of a piping system |
2010-06-01 ~ 2012-02-29 |
14 |
L |
Busan Metropolitan City Office of Education |
Busan Metropolitan City Office of Education |
Sang-ho Lee |
Research project for the seismic performance evaluation and retrofit of Youngdo Girl's High School building |
2010-07-09 ~ 2010-09-06 |
15 |
G |
Ministry of the Interior and Safety |
National Emergency Management Agency |
Sang-hoon Oh |
Development of optimal seismic reinforcement system and performance verification technique for existing low-rise buildings |
2010-08-01 ~ 2011-07-31 |
16 |
P |
Private company |
Doosan E&C |
Jin-hwan Cheung |
Review of durability design for construction of the west entrance bridge of Gyeongnam Innovation City |
2010-09-03 ~ 2010-10-31 |
17 |
P |
Private company |
HYUNDAI AMCO co.,ltd |
Sang-hoon Oh |
Evaluating the performance of a full-scale structure of a hybrid vibration control system |
2010-12-01 ~ 2011-12-31 |
2009
No |
Category |
Government Department |
Funding Organization |
Project Leader |
Project Name |
Date |
1 |
G |
Ministry of Education & Human Resources Development |
National Research Foundation of Korea |
In-tae Kim |
Improving Fatigue Strength of Steel Structures Using Blast Surface Treatment |
2009-05-01 ~ 2011-04-30 |
2 |
G |
Ministry of Education & Human Resources Development |
National Research Foundation of Korea |
In-tae Kim |
Time-dependent tensile load-carrying capacity evaluation method and rehabilitation technique of crroded steel structures |
2009-05-01 ~ 2011-04-30 |
3 |
P |
Private company |
RIST (Research Institute of Industrial Science & Technology) |
Sang-hoon Oh |
Optimization of Coupling Beam Shape and Dynamic Performance Evaluation of High-rise Residential Buildings |
2009-08-01 ~ 2010-11-30 |
4 |
P |
Private company |
Entire Safe System |
Nam-sik Kim |
Seismic Performance Evaluation of a Cone-type Friction Pendulum Bearing System |
2009-07-27 ~ 2010-04-26 |
5 |
G |
Ministry of Construction & Transportation |
Korea Agency for Infrastructure Technology Advancement |
Sang-hoon Oh |
Establish design / production guidelines for high-rise connections (step 1) |
2009-08-28 ~ 2011-02-27 |