[Category] G : Government R&D / P : Private Company / L : Local Government / P.E : Public Enterprise
2024
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | L | local government | Gyeongsangnam-do | Jae-bong Kim | 2024 Earthquake Disaster Response Capacity Enhancement Project in Gyeongsangnam-do | 2024-01-01 ~2024-12-31 |
| 2 | G | public enterprise | Korea Atomic Energy Research Institute | Jae-bong Kim | Support Project for Fostering Communities of Research Facilities and Equipment | 2024-04-01 ~2024-11-30 |
| 3 | G | Ministry of Public Administration and Security | Ministry of Public Administration and Security | Bub-Kyu Jeon | Development of predictive risk monitoring and pipe deformation utilizing expansion joints under ground subsidence for depending underground water pipes | 2024-04-01 ~2026-12-31 |
| 4 | G | Ministry of Public Administration and Security | Ministry of Public Administration and Security | Jae-bong Kim | Establishment of facility for promoting the seismic safety industry | 2024-04-01 ~2026-12-31 |
| 5 | P.E | public enterprise | Korea Institute of Construction Technology | Dong-hyeon Shin | Study on the Development of a Classification Framework for Joint Stiffness in Timber Structures | 2024-05-27 ~2024-11-26 |
| 6 | P | Private company | Metro T&C | Dong-hyeon Shin | Performance Design and Impact Sound Reduction Analysis of Slabs Using Post-Tensioning Techniques | 2024-07-01 ~2025-06-30 |
| 7 | G | Ministry of Education | National Research Foundation of Korea |
Sung-hoon Kang | Development of a Probabilistic Fragility Model for Evaluating the Seismic Resilience of Vulnerable Buildings in Moderate Seismic Regions | 2024-09-01 ~2026-08-31 |
| 8 | G | Ministry of Education | National Research Foundation of Korea |
Si-Young Kim | Uncertainty and Sensitivity Analysis of Structural Damage Probabilities with Respect to Key Parameters in Earthquake Loss Estimation | 2024-09-01 ~ 2026-08-31 |
2023
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | G | public enterprise | Korea Atomic Energy Research Institute | Jae-bong Kim | Support Program for Fostering Communities of Research Facilities and Equipment | 2023-04-01 ~2023-11-30 |
| 2 | G | Ministry of SMEs and Startups | Ministry of SMEs and Startups | Bub-Kyu Jeon | Modular prefabricated canopy structure (shade) system that can prevent and prepare for various disaasterenvironments | 2023-04-01 ~2025-03-31 |
| 3 | G | Ministry of SMEs and Startups | Ministry of SMEs and Startups | Bub-Kyu Jeon | Development of a pipe expansion joints with position-displacement data acquisition function to improve the safety of water pipelines crossing grounds | 2023-07-01 ~2025-06-30 |
| 4 | G | Ministry of SMEs and Startups | Ministry of SMEs and Startups | EunRim Beak | Development of 3-dimensional seismic isolator for control cabinets to respond o earthquakes exceeding design standard | 2023-07-17 ~2025-07-16 |
| 5 | G | Ministry of SMEs and Startups | Ministry of SMEs and Startups | Young-soo Jeong | Development of a 3D seismic isolator for performance verification of safety system cabinets for earthquake-reponding nuclear power plants that exceed design standards | 2023-07-17 ~2025-07-16 |
| 6 | G | Ministry of Trade, Industry and Energy | Industrial Complex Corporation | Bub-Kyu Jeon | Modular Smart Piping System for Ground Deformation Response to Enhance Safety of Buried Pipelines in Soft Ground | 2023-10-01 ~2025-09-30 |
| 7 | L | local government | Gyeongsangnam-do | Sang-ho Lee | 2023 Earthquake Disaster Response Capacity Enhancement Project in Gyeongsangnam-do | 2023-05-01 ~2023-12-31 |
| 8 | P.E | public enterprise | Industry-Academic Cooperation Foundation | Dong-hyeon Shin | Development of Structural Performance Enhancement Techniques for Deteriorated Reinforced Concrete Structures Using Post-Tensioned Steel Rods | 2023-05-01 ~2024-04-30 |
| 9 | G | Ministry of Public Administration and Security | National Disaster and Safety Research Institute | EunRim Beak | Analysis of Collapse Mechanisms in Reinforced Concrete Slabs Considering Collapse-Inducing Factors | 2023-05-02 ~2023-11-28 |
| 10 | L | local government | Gunsan city | Dong-hyeon Shin | Third-Party Review Service for Cultural Heritage Repair and Detailed Safety Inspection of the Former Namjoseon Electric Company M429Building in Gunsan | 2023-11-24 ~2023-12-23 |
| 11 | P.E | public enterprise | Korea Institute of Industrial Technology | EunRim Beak | Earthquake disaster and safety industry status and demand survey | 2023-11-01 ~2023-12-31 |
| 12 | P.E | public enterprise | Busan Port Authority | Young-soo Jeong | Service for Safety Diagnosis Verification and Seismic Reassessment of Temporary Pedestrian Bridge (BR3) | 2023-12-06 ~2024-02-03 |
2022
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | G | Ministry of Trade, Industry and Energy | Korea Institute of Energy Technology Evaluation and Planning | Dong-Uk Park | Development of seismic reinforcement technology and seismic safety enhancement of aged equipments against beyond design earthquake | 2022-04-01 ~2026-12-31 |
| 2 | G | Ministry of Education | National Research Foundation of Korea |
Jung-han Kim | Development of big data-based nuclear power,plant site input earthquake evaluation technology | 2022-04-01 ~2024-12-31 |
| 3 | L | local government | Gyeongsangnam-do | Sang-ho Lee | 2022 Earthquake Disaster Response Capacity Enhancement Project in Gyeongsangnam-do | 2022-05-01 ~2022-12-31 |
| 4 | G | Ministry of SMEs and Startups | Ministry of SMEs and Startups | Sang-ho Lee | Development of IoT Sensors and Monitoring Devices for Measuring the Motion of Seismic Isolation Systems in Earthquake-Prepared Facilities (Commercialization R&D) | 2022-06-01 ~2023-05-31 |
| 5 | G | Ministry of Education | National Research Foundation of Korea |
Su-won Son | Research on the behavior of the ground-buried pipe and development of damage reduction method during ground deformation according to ground deformation according to ground and buried pipe coditions considering | 2022-06-01 ~2022-08-31 |
| 6 | G | Ministry of Education | National Research Foundation of Korea |
Sung-jin Chang | Development of static load test method for seismic performance evaluation of non-structural elements | 2022-06-01 ~2025-05-31 |
| 7 | G | Ministry of Education | National Research Foundation of Korea |
HeaYoung Park | Development of pre-fablicated seismic system for RHS column-to-beam connections utilizing weak-beam mechanizm | 2022-06-01 ~2022-08-31 |
| 8 | P.E | public enterprise | Industry-Academic Cooperation Foundation | Sang-ho Lee | 2022 Support Program for STEM University Student Competitions (Seismic Design Competition for Structures) | 2022-06-01 ~2023-01-31 |
| 9 | P | Private company | Lotte Engineering & Construction, etc. | Sang-hoon Oh | Wind Load Safety Assessment of the Sky Bridge at Lotte Castle De Mer, North Port of Busan | 2022-11-16 ~2023-05-15 |
| 10 | G | Ministry of Education | National Research Foundation of Korea |
Sang-hoon Oh | Development of seismic performance improvement technology and seismic design process of soft-story damage concentration type structural system | 2022-03-01 ~2025-02-28 |
| 11 | P | Private company | Korea Women's Science and Technology Support Center | Sae-Beuk Jung | Development of Structural Retrofit Techniques for Buildings Using Low-Cost Shape Memory Alloys | 2022-04-01 ~2022-10-31 |
| 12 | G | Ministry of Land, Infrastructure and Transport | Ministry of Land, Infrastructure and Transport | Jae-bong Kim | Development of seismic retrofit techniques for small and medium-sized buildings on soft ground using bearing force dispersion and restraint mechanism of soil | 2022-04-01 ~2022-12-31 |
| 13 | G | Ministry of Land, Infrastructure and Transport | Ministry of Land, Infrastructure and Transport | Young-soo Jeong | Development of seismic valve box with bellows expansion pipe joint to secure earthquake safety in underground pipelines | 2022-04-01 ~2023-12-31 |
| 14 | P.E | public enterprise | Korea Atomic Energy Research Institute | Jae-bong Kim | Support Program for Research Equipment Communities and Facility Networks (Consortium of Seismic Shaking Table Operators) | 2022-04-01 ~2022-11-30 |
2021
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | P.E | Ministry of SMEs and Startups | Gyeongnam Technopark | Sang-ho Lee | 2020 Online Shared Video Conference Facility Establishment Project | 2021-01-18 ~2021-02-26 |
| 2 | G | Ministry of the Interior and Safety | Geological Resources Research Institute | Jung-han Kim | Development of urban seismic risk assessment methodology considering domestic earthquake characteristics | 2021-03-01 ~2024-12-31 |
| 3 | G | Ministry of Education | National Research Foundation of Korea |
Sung-wan Kim | Development of multi-point monitoring method of structures using image analysis | 2021-03-01 ~2024-02-09 |
| 4 | G | Ministry of Education | National Research Foundation of Korea |
Bub-gyu Jeon | Experimental Parameter Study for Actual Failure based Quantitative Limit State of a NPP Piping System | 2021-03-01 ~2025-02-28 |
| 5 | P.E | public enterprise | Korea Atomic Energy Research Institute | Jae-bong Kim | Structural Performance Evaluation and Shaking Table Tests of Pre-Installed Anchor Systems | 2021-04-01 ~2021-09-30 |
| 6 | P.E | public enterprise | Korea Atomic Energy Research Institute | Sung-Jin Jang | Full-Scale Piping Shaking Table Test for Performance Evaluation of Tuned Mass Dampers for Piping Systems | 2021-04-01 ~2021-06-30 |
| 7 | G | Ministry of Land, Infrastructure and Transport | Ministry of Land, Infrastructure and Transport | Dong-heock Jeong | Development of low-cost, high-performance seismic retrofitting method for RC columns using Fe-based SMA and rapid non-destructive evaluation technique | 2021-04-01 ~2022-12-31 |
| 8 | G | Ministry of Land, Infrastructure and Transport | Ministry of Land, Infrastructure and Transport | Bub-gyu Jeon | A study on enhancement of low-cost seismic performance by applying an earthquake-resistance bellows expansion joint for hydrogen transport networks using city gas grids | 2021-04-01 ~2022-12-31 |
| 9 | G | Ministry of Education | Korea Basic Science Institute | Jae-bong Kim | Seismic shaking table facility workshop for nonstructural component testing | 2021-04-15 ~2021-11-30 |
| 10 | G | Ministry of Trade, Industry and Energy | Korea Institute of Energy Technology Evaluation and Planning | Bub-gyu Jeon | Development of Seismic Performance Evaluation Methods for Major Equipment in Operating Nuclear Power Plants Considering Aging Effects from Decommissioned Plants | 2021-05-01 ~2025-12-31 |
| 11 | L | local government | Gyeongsangnam-do | Sang-ho Lee | 2021 Earthquake Disaster Response Capacity Enhancement Project in Gyeongsangnam-do | 2021-05-03 ~2021-11-30 |
| 12 | G | Ministry of Education | National Research Foundation of Korea |
Dong-heock Jeong | Development and Performance Evaluation of Vibration Control Devices for Buildings Using Low-Cost Shape Memory Alloys | 2021-06-01 ~2022-08-31 |
| 13 | G | Ministry of Education | National Research Foundation of Korea |
Sang-ho Lee | Evaluation of the Interrelationship Between Soft-Story Effects and Torsional Behavior in Piloti Structures | 2021-06-01 ~2026-05-31 |
| 14 | P.E | public enterprise | Industry-Academic Cooperation Foundation | Sang-ho Lee | 2021 Support Program for Engineering Student Competitions (Seismic Design Competition for Structures) | 2021-07-01 ~2022-01-31 |
| 15 | P.E | public enterprise | Seoul Institute of Technology | Young-soo Jeong | Verification Test and Technical Review on Vibration Measurement of Buildings Using Smartphones | 2021-07-30 ~2022-06-24 |
| 16 | G | Ministry of SMEs and Startups | Ministry of SMEs and Startups | Dong-heock Jeong | Development of space-saving earthquake control system using buckling-restrained panel damper | 2021-08-31 ~2022-04-30 |
| 17 | G | Ministry of SMEs and Startups | Ministry of SMEs and Startups | Sang-ho Lee | Development of loT sensor and monitoring device for measuring the motion of equipment seismic isolator in preparation for eqrthquake disaster | 2021-08-31 ~2022-04-30 |
| 18 | G | Ministry of Trade, Industry and Energy | Korea Industrial Technology Assessment and Management Institute | Sang-hoon Oh | Structural Stability Assurance Project for Shared Pipe Racks in the Yeosu Industrial Complex | 2021-11-01 ~2024-10-31 |
2020
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | G | Ministry of SMEs and Startup | Korea Technology and Information Promotion Agency for SMEs |
Sang-hoon Oh | Development of vertical strut seismic system with high performance steel damper |
2020-01-01 ~2020-10-31 |
| 2 | P | Private company | DOORI Co.,Ltd | Eun-rim Baek | Development of seismic performance improvement technology of SMC water storage tank |
2020-03-01 ~2021-02-28 |
| 3 | G | Ministry of Education | National Research Foundation of Korea | Su-won Son | Dynamic Modeling and Seismic Performance Evaluation of Geotechnical Seismic Foundation Isolation System according to Ground Condition and Foundation | 2020-03-01 ~2021-02-28 |
| 4 | P.E | Ministry of Trade and Industry | Korea Electric Power Corporation (KEPCO) | Bub-gyu Jeon | Full-scale test of substation facilities for seismic performance evaluation | 2020-05-18 ~2020-09-17 |
| 5 | G | Ministry of the Interior and Safety | Ministry of the Interior and Safety | Sang-hoon Oh | Development of Post-earthquake Damage Evaluation and Rapid Rehabilitation Techniques for Buildings | 2020-04-29 ~2020-12-31 |
| 6 | G | Ministry of the Interior and Safety | Korea Evaluation Institute Of Industrial Technology | Hyeong-suk Choi | Damage assessment and management for infrastructure systems using learningbased seismic force estimation method | 2020-04-01 ~2020-12-31 |
| 7 | P.E | Ministry of Science, ICT and Future Planning | Gyeongnam Techno Park | Hyeong-suk Choi | Structural Safety Evaluation Technology of Existing Public Buildings Using Digital Twin | 2020-06-01 ~2020-11-30 |
| 8 | P | Private company | JK RST Co., Ltd | Su-won Son | Performance Evaluation of Seismic Isolation System Using Seismic Simulation Shaking Table System | 2020-06-01 ~2020-07-31 |
| 9 | G | Ministry of Education | National Research Foundation of Korea | Young-soo Jeong | Development of optimized technique of maintenance coating for extend service life of steel bridge | 2020-06-01 ~2023-05-31 |
| 10 | P | Private company | Sandol Corporation Co., Ltd | Sang-hoon Oh | Experimental Services for Seismic Performance Evaluation of Ungrounded Materials | 2020-06-23 ~2020-11-30 |
| 11 | G | Ministry of Education | National Research Foundation of Korea | In-tae Kim | Development of visual inspection technique for fire damage evaluation of infrastructures | 2020-07-01 ~2020-09-11 |
| 12 | P | Private company | Doosan E&C | Bub-gyu Jeon | Production and test of Tuned Mass Damper for APR1400 | 2020-07-01 ~2020-10-31 |
| 13 | P.E | National Land Safety Management Agency | National Land Safety Management Agency | Sang-ho Lee | Service for the preparation of comprehensive performance improvement project procedures and evaluation systems of existing buildings | 2020-07-13 ~2020-10-31 |
| 14 | P.E | Korea Atomic Energy Research Institute | Korea Atomic Energy Research Institute | Jae-bong Kim | Seismic performance evaluation test for concrete anchorage of nuclear equipment | 2020-09-01 ~2023-02-28 |
| 15 | P.E | Korea Gas Corporation | Korea Gas Corporation | Sung-jin Chang | Failure behavior analysis and fragility calculation of full-scale pipe for high strain cyclic loads | 2020-11-10 ~2020-12-18 |
| 16 | P.E | Korea Atomic Energy Research Institute | Korea Atomic Energy Research Institute | Jae-bong Kim | Research of vibration characteristics of shear wall structures | 2020-12-29 ~2021-08-25 |
2019
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | G | Ministry of Education |
National Research Foundation of Korea |
Su-won Son | Dynamic Modeling and Seismic Performance Evaluation of Geotechnical Seismic Foundation Isolation System according to Ground Condition and Foundation |
2019-06-01 ~2022-05-31 |
| 2 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Seong-haeng Lee | Development of temperature change processor and equation for the estimation of the moving capacity of bridge expansion joints and moving bearings |
2019-06-01 ~2022-02-28 |
| 3 | G | Ministry of Education |
National Research Foundation of Korea |
Jung-han Kim | Generation of Input Ground Motions for Performance Based Seismic Design | 2019-06-01 ~2024-05-31 |
| 4 | L | National University |
Pusan National University |
Sang-ho Lee | Review on the safety rating adequacy of buildings in Pusan National University | 2019-07-23 ~2019-09-20 |
| 5 | P | Private company | EBM LEADER Co.,Ltd | Sang-ho Lee | Seismic performance verification and development of seismic design method for heat crossing fasteners | 2019-10-01 ~2020-09-30 |
| 6 | G | Private company | Korea Gas Corporation |
Sung-jin Chang | Testing and examination of fracture behavior of actual piping under tensile and compressive loads |
2019-03-04 ~2019-07-03 |
| 7 | G | Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Eun-rim Baek | Development of TCP(Textile-reinforced mortar & Capillary tube Panel) retrofitting technology to simultaneously improve Seismic and Energy Performance of the existing masonry buildings(SEP+) |
2019-04-05 ~2021-12-31 |
| 8 | P | Private company | DAEWOO E&C | Chi-young Jung | Evaluation on suitability of civil structure and improvement of construction safety for F-X hangar(2nd) | 2019-05-02 ~2019-12-31 |
| 9 | P | Private company | Korea Gas Corporation |
Sung-jin Chang | Examination of fracture behavior of actual pipes under cycling loads | 2019-09-05 ~2019-11-30 |
| 10 | P | Private company | DAEHEUNG MECHATRONICS Co.,Ltd |
Sung-jin Chang | Development of design technology for diesel generator bed system | 2019-11-12 ~ 2020-07-09 |
2018
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | P | Private company | Woori E&C Co.,Ltd | Sang-ho Lee | Research project on the seismic performance evaluation of Bugok elementry school | 2018-01-01 ~2018-02-28 |
| 2 | P | Private company | POSCO Co,Ltd. | Sang-hoon Oh | Gwangyang Works multi-use facility and main structure 1st stage seismic performance evaluation service |
2018-01-02 ~2018-08-31 |
| 3 | P | Private company | POSCO E&C | Sang-hoon Oh | Performance evaluation of seismic isolation system in logistics warehouse | 2018-02-01 ~2018-08-31 |
| 4 | P | Private company | Korea Iron & Steel Association |
Sang-hoon Oh | Steel house seismic performance evaluation experiment service | 2018-02-01 ~2018-05-31 |
| 5 | P | Private company | SY BUILD Co.,Ltd | Sang-hoon Oh | Seismic performance evaluation experiment service of SY Polycam House | 2018-02-01 ~2018-07-31 |
| 6 | P | Private company | HANADAPCO Co.,Ltd. | Sang-ho Lee | Study of seismic performance of fire-resist door (single / double type) |
2018-02-20 ~2019-02-19 |
| 7 | P | Private company | POSCO Co,Ltd. | Sang-hoon Oh | Seismic reinforcement dynamic performance evaluation of masonry applied to steel | 2018-03-01 ~2018-05-31 |
| 8 | G | Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Sang-hoon Oh | Development of seismic performance improvement of non-structural components in buildings |
2018-04-13 ~2021-12-31 |
| 9 | G | Ministry of Public Safety and Security |
National Disaster Management Research Institute (NDMI) |
Sang-hoon Oh | National earthquake disaster prevention R & D roadmap planning research | 2018-05-29 ~2018-08-27 |
| 10 | G | Ministry of Education |
National Research Foundation of Korea |
Jae-bong Kim | A study on development and practical application of seismic performance improvement system of anchorage for non-structural members |
2018-06-01 ~2021-05-31 |
| 11 | G | Ministry of Education |
National Research Foundation of Korea |
Sang-ho Lee | Evaluation of seismic performance of buildings with pilotis considering dynamic behavior depending on lateral irregularity |
2018-06-01 ~2021-05-31 |
| 12 | P.E. | Ministry of Environment |
K-Water | Jung-han Kim | Development of a seismic design method for water facilities and TEST BED evaluation | 2018-06-22 ~2019-12-21 |
| 13 | G | Ministry of Education |
National Research Foundation of Korea |
Jung-han Kim | Development of 3 dimensional seismic isolation technology and structural analysis and testing methods |
2018-07-01 ~2019-06-30 |
| 14 | G | Ministry of the Interior and Safety |
National Disaster Management Research Institute (NDMI) |
Sang-hoon Oh | A Study on the Seismic Strengthening Method of Building Structures with Circular Steel Bar Damper for External Structure Reinforcement |
2018-08-16 ~2019-08-15 |
| 15 | G | Ministry of Education |
National Research Foundation of Korea |
Su-won Son | Design method proposal according to ground conditions of improved liquefaction countermeasure methods for liquefaction prevention of sandy ground | 2018-09-01 ~2019-08-31 |
| 16 | P | Private company | UNOVICS ENC Co.,Ltd. | Hyeong-suk Choi | Seismic performance evaluation of supports for firefighting equipment piping | 2018-11-26 ~2019-11-25 |
| 17 | P.E. | Ministry of Trade and Industry | Korea Hydro & Nuclear Power Co.,Ltd |
Hyeong-suk Choi | Reproduction of Seismic Verification Document for Hanbit Units 3 and 4 | 2018-12-10 ~2019-10-09 |
| 18 | P | Private company | Entire Safe System | Young-soo Jeong | Development for operational state monitoring system and design technique of seismic isolation | 2018-07-01 ~2020-06-30 |
| 19 | P | Private company | MIDAS IT | Sung-jin Chang | Verification of seismic risk assessment software for nuclear piping system | 2018-07-16 ~2018-09-30 |
| 20 | P | Private company | DAEWOO E&C | Chi-young Jung | Evaluation on suitability of civil structure and improvement of construction safety for F-X hangar | 2018-10-01 ~2019-05-31 |
| 21 | P | Private company | PPI SYSTEM | Sung-jin Chang | Seismic Performance Evaluation of APPIZ water pipe | 2018-12-11 ~2019-03-31 |
2017
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | P | Private company | POSCO Co,Ltd. | Sang-hoon Oh | Seismic inspection and performance evaluation of Pohang building | 2017-01-01 ~2017-06-30 |
| 2 | P | Private company | POSCO Co,Ltd. | Sang-hoon Oh | Dynamic performance evaluation of apartment remodeling using steel structure system |
2017-01-01 ~2017-06-30 |
| 3 | P | Private company | Iljin Electric Co.,Ltd | Bub-gyu Jeon | Seismic performance evaluation of a cable termination by FEM analysis | 2017-02-01 ~2017-05-31 |
| 4 | P | Private company | Cistern Co.,Ltd | Eun-rim Baek | Development of seismic design method of CSP water tank with tank-rack | 2017-03-01 ~2018-02-28 |
| 5 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Chi-young Jung | Development of Self-deformation Recoverable Construction Connector for Structural Continuity of Modular PC Members |
2017-03-01 ~2020-02-29 |
| 6 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Bub-gyu Jeon | An experimental study for Evaluating ultimate behavior of weak components of isolated nuclear power plant. |
2017-03-01 ~2019-12-31 |
| 7 | G | Ministry of Trade and Industry |
Korea Evaluation Institute of Industrial Technology (KEIT) |
Bub-gyu Jeon | A Study on standardization foundation for piping system to secure seismic safety | 2017-04-01 ~2019-12-31 |
| 8 | L | Seoul Metropolitan Office of Education |
Seoul Metropolitan Office of Education |
Sang-hoon Oh | Seismic performance evaluation verification service for Anam and Ohhyeoncho Elementary School in Seoul |
2017-05-12 ~2017-08-12 |
| 9 | G | Ministry of Education |
National Research Foundation of Korea |
Bub-gyu Jeon | Multi-point monitoring technology of piping and pressure vessel of nuclear power plant using PTZ (Pan-Tilt-Zoom) system |
2017-06-01 ~2020-05-31 |
| 10 | G | Ministry of Education |
National Research Foundation of Korea |
Eun-rim Baek | Study on seismic design model and interaction between a building and an elevated water tank considering liquid motion by earthquake |
2017-06-01 ~2020-05-31 |
| 11 | G | Ministry of Education |
National Research Foundation of Korea |
Sung-wan Kim | Image-based automation system for tension measurement of long-span bridge cable | 2017-06-01 ~2020-05-31 |
| 12 | G | Ministry of Education |
National Research Foundation of Korea |
Hae-yong Park | A study on development and practical application of the damage controlled system attached to beam end | 2017-06-01 ~2019-05-31 |
| 13 | G | Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Jae-bong Kim | Developing standard test procedures based on performance for technology and product verification in the construction field | 2017-06-01 ~2021-05-31 |
| 14 | G | Ministry of Trade and Industry |
Korea Industrial Complex Corporation |
Bub-gyu Jeon | Development of Large Capacity Seismic Diesel Generator using Seismic Isolation Bed System | 2017-06-01 ~2018-05-31 |
| 15 | P | Private company | Bukyung BDS Co.,Ltd | Sang-hoon Oh | Static test for structural performance evaluation of steel hysteresis damper | 2017-06-15 ~2017-08-15 |
| 16 | P | Private company | HANMAEK E&C | Sang-ho Lee | Review of siesmic performance of earthquake resistant exterior panel | 2017-07-01 ~2017-12-31 |
| 17 | P | Private company | POSCO Co,Ltd. | Sang-hoon Oh | Dynamic performance evaluation of open damping damper system | 2017-07-01 ~2017-11-30 |
| 18 | G | Ministry of Trade and Industry |
Korea SMEs and Startups Agency |
Eun-rim Baek | Seismic simulation and experiment of isolated water tank with exterior reinforcement | 2017-07-03 ~2019-07-02 |
| 19 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
In-tae Kim | Development of thermochromic sensor for rapid evaluation of fire damage to inrastructures | 2017-09-01 ~2020-08-31 |
| 20 | G | the Small and Medium Business Administration |
Korea SMEs and Startups Agency |
Hae-yong Park | Diesel engine generator seismic and smoke-reducing political performance test | 2017-09-05 ~2017-11-30 |
| 21 | G | Ministry of Science, ICT and Future Planning |
Electronics and Telecommunications Research Institute |
Sang-ho Lee | Structural analysis of communication buildings for seismic design of communication facility | 2017-10-27 ~2017-11-30 |
| 22 | G | Korea Meteorological Administration |
Korea Meteorological Institute |
Jung-han Kim | Analysis of correlation between earthquake damage and intensity for architectural structures | 2017-11-01 ~2018-10-31 |
| 23 | P | Private company | POSCO Co,Ltd. | Sang-hoon Oh | (Work Step 2) Seismic performance evaluation of main structures in Pohang ironworks | 2017-11-06 ~2018-05-31 |
| 24 | G | Ministry of Trade and Industry |
Korea Institute of Energy Technology Evaluation and Planning (KETEP) |
Jung-han Kim | Development of Risk Quantification Technology for Seismic Probabilistic Safety Assessment | 2017-12-01 ~2022-06-30 |
| 25 | P | Private company | HANADAPCO Co.,Ltd. | Sang-ho Lee | Study of seismic performance of non-fire resist watertight door(single / double type) | 2017-12-20 ~2018-12-20 |
| 26 | G | Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Hyeong-suk Choi | Development of Seismic Damage Prediction System for Bridge Structures | 2017-01-01 ~2019-12-31 |
| 27 | G | Ministry of Trade and Industry |
Korea Institute of Energy Technology Evaluation and lanning (KETEP) |
Dong-uk Park | Development of seismic performance evaluation technology of nuclear structures and equipments for excessively design high frequency earthquake | 2017-05-01 ~2022-04-30 |
| 28 | P | Private company | Korea Atomic Energy Research Institute |
Bub-gyu Jeon | Seismic performance verification experiment of through bolt and non-contraction grout for NPP wall | 2017-10-24 ~2017-12-27 |
2016
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | P.E | Ministry of Trade and Industry |
Korea Electric Power Corporation(KEPCO) | Sang-hoon Oh | Development and design of seismic reinforcement system for KEPCO office building | 2016-06-02 ~2017-12-31 |
| 2 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea | Sung-wan Kim | Image-based automation system for tension measurement of long-span bridge cable | 2016-08-01 ~2017-10-31 |
| 3 | G | Ministry of Trade and Industry |
Korea Southern Power Co.,Ltd |
Dong-uk Park | Development of technique for 3 dimensional isolation bearing for energy plant | 2016-11-01 ~2017-10-30 |
| 4 | P | Private company | J&D Firefighting Co.,Ltd | Jae-bong Kim | Confirmation service for experimental results of Tokyo Polytechnic University in Japan, which evaluated the seismic performance of fire fighting piping | 2016-11-01 ~2016-11-30 |
| 5 | P | Private company | RIST (Research Institute of Industrial Science & Technology) | Sang-hoon Oh | Seismic test and evaluation of panel system | 2016-12-01 ~2017-05-31 |
| 6 | G | Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Hyeong-suk Choi | Development of seismic proofing methods and safety manuals for the storage racks in distribution center under earthquake | 2016-12-26 ~2018-06-25 |
| 7 | P | Private company | Hyundai TECH | Bub-gyu Jeon | Seismic performance evaluation of bus duct system for electric buildings | 2016-04-25 ~2016-05-25 |
| 8 | P | Private company | LS ELECTRIC | Hyeong-suk Choi | Mold transformer seismic performance analysis and test verification | 2016-07-08 ~2016-09-30 |
2015
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Nam-sik Kim | Development of Load-carrying Capacity Assessment Method for Existing High-speed Railway Bridge by Using Multi-step Univariate Search Method | 2015-05-01 ~2018-04-30 |
| 2 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Choong-hyun Kang | Development of technology to reduce environmental pollution and the maintenance cost of concrete structure using self-healing and micro-organisms | 2015-07-01 ~2016-11-30 |
| 3 | P | Private company | Deokin Metals | Sang-ho Lee | Study on the shake table test for evaluation of seismic performance of interior and exterior cladding panel | 2015-07-10 ~2015-09-08 |
| 4 | P | Private company | POSCO Co,Ltd. | Sang-hoon Oh | Development of the Dual System Joints Detail and Seismic Performance Evaluation | 2015-08-01 ~2016-02-29 |
| 5 | G | Ministry of Trade and Industry |
Korea Institute of Energy Technology Evaluation and Planning (KETEP) |
Yong-myeong Park | Development of an integrated comdition assessment system for NPP concrete wall structures using drone-aided visual inspection, multi-physics non-destructive evaluation and advanced strctural analysis | 2015-09-01 ~2018-08-31 |
| 6 | P | Private company | Korea Construction Engineering Development Collaboratory Management Institute (KOCED CMI) |
Sang-hoon Oh | Hybrid tower vibration performance evaluation experiment | 2015-09-01 ~2015-10-31 |
| 7 | P | Private company | Deokin Metals | Sang-ho Lee | English report for Study on the shake table test for evaluation of seismic performance of interior and exterior cladding panel | 2015-10-01 ~2015-10-31 |
| 8 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Seong-haeng Lee | Development of Thermal Load Formula Considering Surfacing Thickness of Concrete Bridge Deck | 2015-11-01 ~2018-10-31 |
| 9 | P | Private company | POSCO Co,Ltd. Humans |
Sang-ho Lee | Structural analysis and test of solar structure made of the PosMac profile | 2015-11-20 ~2015-12-30 |
| 10 | P | Private company | Hyundai Powertech | Bub-gyu Jeon | Seismic response analysis for bus duct system | 2015-06-11 ~2015-12-31 |
2014
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | P.E | Ministry of Land, Transport and Maritime Affairs |
Korea Land & Housing Corporation |
Sang-hoon Oh | Research service for seismic performance evaluation of LHI type vibration control system | 2014-01-25 ~2014-06-30 |
| 2 | P | Private company | RIST (Research Institute of Industrial Science & Technology) | Sang-hoon Oh | Vibration performance evaluation between shear wall and frame | 2014-03-11 ~2014-12-31 |
| 3 | P | Private company | Jace Korea Co.,Ltd | Jin-hwan Cheung | Study of performance analysis for partial isolation system | 2014-04-01 ~2014-04-30 |
| 4 | P | Private company | CTC ENG | Jin-man Kim | Services on the socio-economic damage analysis and estimation of recovery cost for Gupo Bridge and Dongseo expressway during earthquake (3) | 2014-07-01 ~2016-02-29 |
| 5 | P | Private company | JOEUN HITEC ENG | Jin-man Kim | Services on the socio-economic damage analysis and estimation of recovery cost for Gupo Bridge and Dongseo expressway during earthquake (2) | 2014-07-01 ~2016-02-29 |
| 6 | P | Private company | Geukdong Engineering Co.,Ltd |
Jin-man Kim | Services on the socio-economic damage analysis and estimation of recovery cost for Gupo Bridge and Dongseo expressway during earthquake (1) | 2014-07-01 ~2016-02-29 |
| 7 | P | Private company | Samsung Heavy Industries |
Jin-hwan Cheung | Insulation System Dynamic Performance Test | 2014-07-07 ~2014-08-07 |
| 8 | G | Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Nam-sik Kim | Development of world-best fundamental technologies for nonlinear fluid-structure-soil interaction analysis by developing p-version dynamic infinite elements and performing sloshing shaking table tests | 2014-07-01 ~2026-07-10 |
| 9 | G | Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Nam-sik Kim | Development of Small Scale Model Test Procedure Applying Nonlinear Similitude Law and Hybrid Simulation | 2014-07-01 ~2016-07-10 |
| 10 | P | Ministry of Land, Transport and Maritime Affairs |
Korea Land & Housing Corporation |
Sang-hoon Oh | Shoes cabinet conduction experiment | 2014-10-01 ~2014-11-30 |
| 11 | P | Private company | SAMADIO system Co.,Ltd | Sang-ho Lee | Study of seismic performance qualification for (light/heavy) watertight door for nuclear power plant | 2014-10-15 ~2015-12-31 |
| 12 | P | Private company | HANADAPCO Co.,Ltd. | Sang-ho Lee | Study of seismic performance qualification test for (light/heavy) watertight door for operational nuclear power plant | 2014-10-15 ~2015-12-31 |
| 13 | P | Private company | Samsung Heavy Industries |
Jin-hwan Cheung | Insulation System Dynamic Performance Test(2) | 2014-11-01 ~2014-12-31 |
| 14 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Chi-young Jung | Evaluation on ultimate strain of rebar with coupler | 2014-11-01 ~2017-04-30 |
| 15 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Jin-hwan Cheung | Evaluation on ultimate strain of rebar embedded in concrete | 2014-11-01 ~2017-04-30 |
| 16 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Sang-ho Lee | Evaluation of Seismic Performance for RC building having vertically discontinued member | 2014-11-01 ~2017-04-30 |
| 17 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
In-tae Kim | Methods for evaluating load-carrying capacity of composite structural members of steel and concrete with corrosion damages | 2014-11-01 ~2017-10-31 |
| 18 | P | Private company | UNOVICS ENC Co.,Ltd. | Jin-hwan Cheung | ISOLATOR seismic building test research | 2014-12-31 ~2015-11-30 |
2013
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | P | Private company | Hyundai Development Company (HDC) |
Seong-haeng Lee | The Structure Stability Evaluation by lift gate model vibration test and Fatihue Damage of Nakdong River Restroration 33th area | 2013-01-01 ~2013-07-31 |
| 2 | P | Private company | Doosung Heavy Industries Co.,Ltd. |
Sang-hoon Oh | DEB structural performance evaluation | 2013-01-21 ~2013-02-03 |
| 3 | P | Private company | Samsung C&T | Seong-haeng Lee | The Structure Stability Evaluation by lift gate model vibration test and Fatihue Damage of Addition of New gate at Nakdong Esuary Dike | 2013-01-21 ~2013-06-30 |
| 4 | P | Private company | SK E&C | Seong-haeng Lee | The Structure Stability Evaluation by lift gate model vibration test and Fatihue Damage of Nakdong River Restroration 20th area | 2013-02-01 ~2013-07-31 |
| 5 | P | Private company | Hanyang Corporation |
Seong-haeng Lee | The Structure Stability Evaluation by lift gate model vibration test and Fatihue Damage of Yeongsan River Restroration 6th area | 2013-02-20 ~2013-05-31 |
| 6 | P | Private company | Samsung C&T | Seong-haeng Lee | The Structure Stability Evaluation by lift gate model vibration test and Fatihue Damage of Han River Restroration 4th area | 2013-02-25 ~2013-05-31 |
| 7 | P | Private company | Daelim Industrial Co.,Ltd. | Seong-haeng Lee | The Structure Stability Evaluation by lift gate model vibration test and Fatihue Damage of Han River estroration 3th area | 2013-03-01 ~2013-05-31 |
| 8 | P | Private company | SEOKWANG INDUSTRIAL CO.,LTD |
In-tae Kim | Load analysis during assembly and installation of 5MW offshore wind monopile-transition | 2013-03-25 ~2013-08-31 |
| 9 | P | Private company | Daelim Industrial | In-tae Kim | Field Construction case of maintenance and reinforcement for existing western nakdong river bridge | 2013-04-16 ~2013-08-31 |
| 10 | P | Private company | Doosung Heavy Industries Co.,Ltd. |
Sang-hoon Oh | DEB(Punching Web Beam) structural performance evaluation | 2013-05-01 ~2013-06-30 |
| 11 | P | Private company | RIST (Research Institute of Industrial Science & Technology) | Sang-hoon Oh | Evaluation and testing of dynamic vibration performance of public buildings | 2013-05-01 ~2014-02-28 |
| 12 | G | Ministry of Land, Infrastructure, and Transport |
Korea Agency for Infrastructure Technology Advancement |
Sang-hoon Oh | Development of structural performance enhancement technologies for small-size or existing buildings against earthquakes and climate changes | 2013-05-15 ~2018-04-14 |
| 13 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Yong-myeong Park | Experimental Study on the Dynamic Concrete Breakout Capacity of Cast-in-place Anchors under Seismic Shear Forces | 2013-06-01 ~2016-05-31 |
| 14 | P | Private company | SAMADIO system Co.,Ltd | Sang-ho Lee | Research for seismic performance evaluation of a watertight door for the Nuclear Power Plant | 2013-06-17 ~2013-07-16 |
| 15 | P | Private company | Doosan E&C | Seong-haeng Lee | The Structure Stability Evaluation by lift gate model vibration test and Fatihue Damage of Nakdong River Restroration 32th area | 2013-07-16 ~2014-02-28 |
| 16 | P | Private company | SAMADIO system Co.,Ltd | Sang-ho Lee | Research for seismic performance evaluation of double type watertight door for Kori Nuclear Power Plant | 2013-09-01 ~2013-11-30 |
| 17 | P | Private company | HANADAPCO Co.,Ltd. | Sang-ho Lee | Research for seismic performance evaluation of double type watertight door for Hanbit Nuclear Power Plant | 2013-09-10 ~2013-12-30 |
| 18 | P | Private company | HANADAPCO Co.,Ltd. | Sang-ho Lee | Research for seismic performance evaluation of single type watertight door for Hanbit Nuclear Power Plant | 2013-09-10 ~2013-11-30 |
| 19 | P | Private company | POSCO Co,Ltd. | Sang-hoon Oh | Seismic Performance Evaluation of Steel Structure Moment Resistance Frames with Non-buckling Braces | 2013-09-16 ~2013-12-31 |
| 20 | P | Private company | Hyundai Development Company (HDC), HANJIN Heavy industries & Construction Co.,Ltd., KDC, KOLON GLOBAL, SSANGYONG E&C, DAEWOO E&C |
Yong-myeong Park | Evaluation of strength for bolt connection joint by oxygen torch cut used for temporary structures in subway construction | 2013-10-01 ~2014-04-30 |
2012
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | P | Private company | ES DASAN | Sang-ho Lee | Structural analysis of the water proof door of flood protection facility in Gori nuclear power plant 1 & 2 | 2012-03-02 ~2012-05-31 |
| 2 | G | Ministry of the Interior and Safety |
National Disaster Management Research Institute (NDMI) |
Sang-hoon Oh | Structural experiment to evaluate the damage of buildings damaged by earthquake and to verify the risk of collapse | 2012-04-06 ~2012-11-02 |
| 3 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Kyeong-min Kim | Development of Damage Intensity and Seismic Capacity Evaluation Method Based on Quantitative Damage Estimation for Reinforced Concrete Structures | 2012-05-01 ~2015-04-30 |
| 4 | P | Private company | HK industrial system Co.,ltd | Sang-hoon Oh | Development of a vibration isolation system for substation facilities and water and switchboards | 2012-05-21 ~2013-03-20 |
| 5 | P | Private company | RIST (Research Institute of Industrial Science & Technology) | Sang-hoon Oh | Seismic reinforcement technique development and dynamic vibration performance test and evaluation of public buildings | 2012-06-01 ~2013-03-31 |
| 6 | G | Ministry of Trade and Industry |
Korea Institute for Advanced Technology (KIAT) |
Jin-hwan Cheung | Development for a rall & frging tapered splice, ASTM A615, Gr.60 for construction of NPP | 2012-06-01 ~2015-04-30 |
| 7 | P | Private company | K2H Co.,Ltd | Sang-ho Lee | Shaking table test for verifying seismic performance of steel-framed buildings with seismic block | 2012-07-16 ~2012-08-15 |
| 8 | G | Ministry of the Interior and Safety |
National Disaster Management Research Institute (NDMI) |
Sang-hoon Oh | Development of Domestic Damage Prediction Technology for Volcanic Earthquakes | 2012-08-01 ~2015-02-28 |
2011
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | P | Private company | GS E&C | Sang-hoon Oh | Vibration control device optimal planning technology for vibration control | 2011-03-01 ~2011-04-30 |
| 2 | G | Ministry of Construction & Transportation |
Korea Agency for Infrastructure Technology Advancement |
Sang-hoon Oh | Establish design / production guidelines for high-rise connections (step 2) | 2011-03-11 ~2014-07-31 |
| 3 | P | Private company | RIST (Research Institute of Industrial Science & Technology) | Sang-hoon Oh | Deck grating new product structural performance test and evaluation | 2011-04-01 ~2011-10-31 |
| 4 | P | Private company | RIST (Research Institute of Industrial Science & Technology) | Sang-hoon Oh | Dynamic test and performance evaluation of complex isolating system | 2011-04-01 ~2011-09-30 |
| 5 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Jin-hwan Cheung | Pounding force assessment in seismic isolated bridge | 2011-05-01 ~2013-04-30 |
| 6 | P | Private company | UJENG | Sang-ho Lee | Experimental research on the seismic performance of the stone exterior wall using EG RS method | 2011-07-11 ~2011-08-10 |
| 7 | G | Ministry of Construction & Transportation |
Korea Agency for Infrastructure Technology Advancement |
Jin-hwan Cheung | Seismic performance evaluation of external reinforcement system for high level SMC water tank | 2011-08-31 ~2012-12-31 |
| 8 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Seong-haeng Lee | Development of an Artificial Neural Expert System for Temperature Load in Bridge Design | 2011-09-01 ~2016-08-31 |
| 9 | P | Private company | RIST (Research Institute of Industrial Science & Technology) | Sang-hoon Oh | Development of performance evaluation technology for special moment beam-column connection applied to plants | 2011-09-01 ~ 2011-12-31 |
| 10 | P | Private company | Doosung Heavy Industries Co.,Ltd. |
Sang-hoon Oh | Structural performance evaluation of corrugated beam | 2011-09-01 ~2012-02-28 |
2010
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | G | Ministry of the Interior and Safety |
National Emergency Management Agency |
Sang-hoon Oh | Static and dynamic experiments to verify the seismic reinforcement effect of masonry structures | 2010-03-23 ~2010-11-18 |
| 2 | P | Private company | Dongho Corporation | Seong-haeng Lee | Hydraulic model vibration test of Geum River 7th area lift gate | 2010-03-24 ~2010-08-23 |
| 3 | P | Private company | Dongho Corporation | Seong-haeng Lee | Hydraulic model vibration test of Nakdong River 20th area lift gate | 2010-03-24 ~2010-08-23 |
| 4 | P | Private company | Hanyang Corporation |
Seong-haeng Lee | Hydraulic model vibration test of Yeongsan River 6th area lift gate | 2010-04-12 ~2010-09-11 |
| 5 | L | Busan Metropolitan City Office of Education |
Busan Metropolitan City Office of Education |
Sang-ho Lee | Research project for the seismic performance evaluation and retrofit of Geumjeong Girl's High School building | 2010-05-07 ~2010-07-05 |
| 6 | L | Busan Metropolitan City Office of Education |
Busan Metropolitan City Office of Education |
Sang-ho Lee | Research project for the seismic performance evaluation of Yunil Middle School building | 2010-05-12 ~2010-06-30 |
| 7 | L | Busan Metropolitan City Office of Education |
Busan Metropolitan City Office of Education |
Sang-ho Lee | Research project for the seismic performance evaluation and retrofit of Modong Middle School building | 2010-05-17 ~2010-07-15 |
| 8 | L | Busan Metropolitan City Office of Education |
Busan Metropolitan City Office of Education |
Sang-ho Lee | Research project for the seismic performance evaluation and retrofit of Gaehwa Elementry School building | 2010-05-14 ~2010-07-12 |
| 9 | L | Busan Metropolitan City Office of Education |
Busan Metropolitan City Office of Education |
Sang-ho Lee | Research project for the seismic performance evaluation and retrofit of Jaesong Girl's Middle School building | 2010-05-17 ~2010-07-05 |
| 10 | L | Busan Metropolitan City Office of Education |
Busan Metropolitan City Office of Education |
Sang-ho Lee | Research project for the seismic performance evaluation and retrofit of Hadan Middle School building | 2010-05-17 ~2010-07-15 |
| 11 | P | Private company | Samsung C&T | Seong-haeng Lee | Lift gate model vibration test of Addition of New gate at Nakdong Esuary Dike | 2010-05-17 ~2010-11-15 |
| 12 | P | Private company | Entire Safe System | Nam-sik Kim | Seismic Performance Evaluation of Cone-type Friction Pendulum Bearing System Using Shaking Table Test | 2010-06-01 ~2011-01-31 |
| 13 | G | Ministry of Science, ICT and Future Planning |
National Research Foundation of Korea |
Jin-hwan Cheung | Ultimate-level seismic performance evaluation of a piping system | 2010-06-01 ~2012-02-29 |
| 14 | L | Busan Metropolitan City Office of Education |
Busan Metropolitan City Office of Education |
Sang-ho Lee | Research project for the seismic performance valuation and retrofit of Youngdo Girl's High School building | 2010-07-09 ~2010-09-06 |
| 15 | G | Ministry of the Interior and Safety |
National Emergency Management Agency |
Sang-hoon Oh | Development of optimal seismic reinforcement system and performance verification technique for existing low-rise buildings | 2010-08-01 ~2011-07-31 |
| 16 | P | Private company | Doosan E&C | Jin-hwan Cheung | Review of durability design for construction of the west entrance bridge of Gyeongnam Innovation City | 2010-09-03 ~2010-10-31 |
| 17 | P | Private company | HYUNDAI AMCO co.,ltd | Sang-hoon Oh | Evaluating the performance of a full-scale structure of a hybrid vibration control system | 2010-12-01 ~2011-12-31 |
2009
| No | Category | Government Department |
Funding Organization |
Project Leader |
Project Name | Date |
|---|---|---|---|---|---|---|
| 1 | G | Ministry of Education & Human Resources Development |
National Research Foundation of Korea |
In-tae Kim | Improving Fatigue Strength of Steel Structures Using Blast Surface Treatment | 2009-05-01 ~2011-04-30 |
| 2 | G | Ministry of Education & Human Resources Development |
National Research Foundation of Korea |
In-tae Kim | Time-dependent tensile load-carrying capacity evaluation method and rehabilitation technique of crroded steel structures | 2009-05-01 ~2011-04-30 |
| 3 | P | Private company | RIST (Research Institute of Industrial Science & Technology) | Sang-hoon Oh | Optimization of Coupling Beam Shape and Dynamic Performance Evaluation of High-rise Residential Buildings | 2009-08-01 ~2010-11-30 |
| 4 | P | Private company | Entire Safe System | Nam-sik Kim | Seismic Performance Evaluation of a Cone-type Friction Pendulum Bearing System | 2009-07-27 ~2010-04-26 |
| 5 | G | Ministry of Construction & Transportation |
Korea Agency for Infrastructure Technology Advancement |
Sang-hoon Oh | Establish design / production guidelines for high-rise connections (step 1) | 2009-08-28 ~2011-02-27 |
지진방재연구센터